Infrastructure – Electricity
In 2009 the electrical cable of 4 MW power stream was installed, which allows undisturbed use of electrical energy in the zone. The free capacity is 1.5 MW.
Furthermore, temporary transformer station was constructed which allows investors to develop their own electrical infrastructure according to their needs.
Contact Us!
Small Steps is facilitated with all required infrastructure for investors
Infrastructure – Access road
The zone is located directly beside highway E 75.
When exiting the highway E75, take the exit “feketic” to the international road M22 to Feketic. After 800m there is a roundabout to “European road”, which is the main road with access to the industrial zone.
Join us! Be surrounded by successful companies!
Infrastructure – Water supply
In 2008 a well was drilled and equipped which enables water supply to the investors.
Construction of the water distribution system started in 2011, as the first investors appeared.